View Single Post
Old 07-02-2008, 11:31 AM
Eagle Beach Boy
Senior Member
 
Eagle Beach Boy's Avatar
 
Join Date: Jun 2007
Location: Eagle Beach
Posts: 205
New Runways Finished

ORANJESTAD – The project for safer runways of the Reina Beatrix airport is officially complete. The runways are now 60 meters longer and better illuminated. The total cost of this project called Runway End Safety Area & Safety Approach Lighting System is more than 13 million florins. Aruba Airport Authority (AAA) started with this project in November of 2007. “The most important objective was extending the runways, so that extra safety zones are created. These safety zones are for aircrafts that have trouble during take off and landing”, said Peter Steinmetz, director of AAA.
The total available length of the runway is now 2814 meters; the illumination of the runway is also improved. The Schiphol group and Netherlands Airport Consultants (NACO) have assisted AAA with advice during the project.
With this project rounded off, our airport meets the requirements of the International Civil Aviation Organization (ICAO)”, says Edison Briezen, minister of Tourism and Transport.

"El Muchacho De Eagle Beach"
Eagle Beach Boy
Ontario, Canada

Eagle Beach Boy is offline   Reply With Quote