    We will return to Aruba in January. Wondered what progress is being made on the hotel next door to Screaming Eagle.
    0 0
     

  2. #2
    Senior Member schexc's Avatar
    Join Date
    Jun 2011
    Location
    The Pearl at Eagle Beach
    Posts
    3,330
    Post Thanks / Like
    Quote Originally Posted by Mohair View Post
    We will return to Aruba in January. Wondered what progress is being made on the hotel next door to Screaming Eagle.
    If you look at SusieLovesAruba trip report pictures, you can see the a couple of shots of the construction site, as viewed from Oceania.

    https://www.aruba.com/forum/redirect...0tRDBPSDlxbUdR




    OUR COUPLE'S RETREAT. THE PEARL CONDO HOTEL AT EAGLE BEACH. CONDO ACCOMMODATES TWO ADULTS. YOU MUST REQUEST UNIT #8. https://photos.app.goo.gl/lRquP1F4VtxyZhR42 RENTING DIRECTLY http://www.pearlarubacondos.com/. SEND PM BEFORE BOOKING FOR REFERRAL .
    1 0
     

  3. #3
    Senior Member
    Join Date
    Nov 2015
    Posts
    257
    Post Thanks / Like
    Thanks!
    0 0
     

  4. #4
    Senior Member SusieLovesAruba's Avatar
    Join Date
    Aug 2021
    Posts
    485
    Post Thanks / Like
    Quote Originally Posted by Mohair View Post
    We will return to Aruba in January. Wondered what progress is being made on the hotel next door to Screaming Eagle.
    Mohair, I could tell that they were really moving this construction along at a fairly good pace as I could see much more had been done on my last day there. I should have taken more pics so you could see the difference. While I was there they worked 6 days, off on Sundays, they start very early too. I got used to the noise in the morning - it was sorta my alarm clock It will still take them awhile but I was amazed on the difference of the site in the 10 days that I was there. They basically had the ground level pretty much done it looked like. I work for an engineering company and I always find construction sites pretty amazing and it interests me.
    0 1
     

  5. #5
    Senior Member robin's Avatar
    Join Date
    Nov 2016
    Location
    Eagle Beach, Oceania, north side
    Posts
    6,464
    Post Thanks / Like
    It is supposed to take 5 years to build. They work a week or two full on, then almost nothing. We are figuring it'll be longer than 5 years.

  6. #6
    Senior Member SusieLovesAruba's Avatar
    Join Date
    Aug 2021
    Posts
    485
    Post Thanks / Like
    Quote Originally Posted by robin View Post
    It is supposed to take 5 years to build. They work a week or two full on, then almost nothing. We are figuring it'll be longer than 5 years.
    Thanks Robin, that is interesting.
    0 0
     

  7. #7
    Senior Member
    Join Date
    Nov 2015
    Posts
    257
    Post Thanks / Like
    Thanks, Robin! Five years sounds good!
    0 0
     

  8. #8
    Senior Member FBS199's Avatar
    Join Date
    May 2007
    Location
    Lighthouse, Marriott Beaches
    Posts
    356
    Post Thanks / Like
    Loved your Antarctica Trip Photos !!! Looks like a wonderful trip.

    0 0
     

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •